We started moving in almost two weeks ago, but are still settling down and waiting for odds and ends. I will post more pictures as each room is completed.
6/27 Columns, shutters, landscaping. Still waiting on a little trim paint and gutters
6/27 Garage doors
6/22 Porch Columns and final dirt grading. Next week landscape and trim will be done!
Wood floors got stained
Lots of finish work to be done: shutters, columns, paint trim and flashing, stain garage doors and add decorative hardware, sod, landscaping,etc. It's all supposed to happen in the next ten days!
Porch and sidewalk (porch still needs columns)
kitchen
Sunroom
View of sidewalk from house
June 19th...kids' bathroom. Just needs mirrors
June 19th Adam's room. Light needs to be straightened and wall decals added.
June 19th Central vac!
June 18th, sidewalk, driveway, porch, patio
June 12th Backsplash
June 12th Pastelcote is on. This is the back of the house. We will likely paint the trim a contrasting color in the near future.
June 12th: lighting
June 8th: Fireplace is done
June 7th Appliances are going in
June 5th 2012: Granite.
Paint!
Stain
Stair rails!
Stone is up.
Cabinets are going in.
May 2012 Ugly orange brick is up. This will be covered with a masonry application called Pastelcote in one month (it needs to cure)
Drywall
Some stucco
Starting to look like a house
Framing
Foundation
Footings
Dirt and grading